United States Department of Agriculture
Natural Resources Conservation Service
Texas Go to Accessibility Information
Skip to Page Content
Texas coast



 

 

 



Other Links

The documents on this page require Adobe Acrobat.

Links to On-Line Reports that Include Team Contributions

Coastal Bend Bays and Estuary Program
Characterization of Nonpoint Sources and Loadings to the Corpus Christi Bay National Estuary Program Study Area, 1996 (PDF; 3.68 Mb)
Texas State Soil and Water Conservation Board Brush Project (Brush I)
Lake Aquilla

Executive Summary, 2001 (PDF; 70 Kb))
SWAT Modeling, 2001 (PDF; 1.94 Mb)
APEX Modeling, 2001 (PDF; 1.44 Mb)

Texas Water Resources Institute
Ecosystem and Wildlife Implications of Brush Management: (PDF; 10 MB)

Brush Management/Water Yield Feasibility Study for Four Watersheds in Texas (PDF; 4 Mb)
Texas State Soil and Water Conservation Board Brush Project (Brush II)
Red River Authority Report - Assessment of Brush Management/Water Yield Feasibility for the Lake Arrowhead Watershed, 2002 (PDF)

Lower Colorado River Authority - Lake Brownwood Watershed Brush Control Assessment and Feasibility Study, 2002 (PDF)

Brazos River Authority - Fort Phantom Hill Reservoir Watershed Brush Control Assessment and Feasibility Study, 2002 (PDF)

Brazos River Authority - Palo Pinto Reservoir Watershed Brush Control Assessment and Feasibility Study, 2002 (PDF)

Reports that Include Team Contributions

  • Tarrant Regional Water District - Upper Trinity River Basin Study, 1995
  • Brazos River Authority - Bosque Watershed Pilot Project, 1996
  • Internal Report - Nonpoint Source Assessment of the Bosque River Watershed, 1997
  • Brazos River Authority - Assessment of Flow and Sediment Loadings and BMP Analysis for Lake Aquilla and Lake Limestone, 1998
  • Upper Colorado River Authority - North Concho River Watershed: Brush Control
  • Planning, Assessment, & Feasibility Study, 1998
  • Big Country RC&D - Oak Creek/Lake Trammell Water Quality Project, 1998
  • Brazos River Authority - Lake Granger Sediment Study, 1999
  • Tarrant Regional Water District - Upper Trinity River Basin Cooperative Study, 1999
  • Lower Colorado River Authority - Use of a Phased Total Maximum Daily Load Water
  •  Quality Decision Making Process on Row Crop Production, 2000

< Back to WRAT