EQIP Program in Delta County
Updated
11/28/2005
The Environmental Quality Incentives Program (EQIP)
offers cost share assistance to agricultural producers to implement
on-farm conservation practices. The Natural Resources Conservation
Service (NRCS) determines eligible producers for the EQIP program and
determines eligible land. Eligible producers may apply for cost share
assistance on conservation practices that will address the identified
resource concern identified by the Local Work Group (LWG).
Interested agricultural producers may apply in person at the
Delta County USDA Service Center. Applicants may also request
EQIP
assistance by telephone, Fax, e-mail, or letter.
Franz T. Pittman,
District Conservationist
State Resource Concerns Priority Areas that include part of
Delta County:
Objective:
The objectives of the Delta County EQIP Local Work Group are to promote the
use of conservation practices for improving the natural resources throughout the
county.
County EQIP Resource Concern:
In Delta County for 2006, the LWG has identified the following resource
concerns as being top priority for cost share assistance this year – Plant
Health on Pastureland and Soil Erosion on Cropland were selected as the two
highest priority concerns in Delta County. 80 percent of the county allocated
funds will be used for Plant Health and 20 percent of the county allocated funds
will be used for Soil Erosion.
Eligible Practices and Cost Share Rates:
Limited Resource Producers – 90 percent
Beginning Farmers/Ranchers – 50 percent
Others – 50 percent
Practices will be cost shared based on the established average cost of
the practice. The amount of cost share earned will be the number of
units certified after completion multiplied by the average cost
multiplied by the cost share percentage.
Cost sharing will be allowed for the following practices as identified
in the Field Office Technical Guide-
Pasture Planting, Critical Area Planting, Pond, Fence, Grade
Stabilization Structure
For cost share consideration, these practices must be needed to
significantly improve plant health on pastureland-
Pasture Planting 512 – 100 acres maximum. Average cost = $55 per acre
for common Bermuda, $80 per acre for improved seed, $35 per acre for
overseeding legumes, $135 per acre for sprigging.
Nutrient Management 590 – Average cost = $48 per acre. Cost share is for
establishment of grasses and legumes. Rate based on 40-40-40 N-P-K per
acre. Lime applied per acre is $35 per ton. (Soil test required at time
of sign-up.)
Pest Management 595 – Average cost = $15 per acre, chemical or
mechanical. Cost share is for establishment of grass.
Critical Area Planting 342 – 5 acres maximum. Average cost = $450 per
acre for light shaping, $550 per acre for medium shaping, $700 per acre
for heavy shaping. Seedbed Prep – Medium at $38 per acre, Seeding
Operation – Broadcast and Roll at $10 per acre, Seed – Common Bermuda at
$3 per pound PLS pure live seed. Cost share is for establishment of
grass on spoil and disturbed areas.
Nutrient Management 590 – Average cost = $48 per acre. Cost share is for
establishment of grass on spoil and disturbed areas.
Pest Management 595 – Average cost = $15 per acre, chemical or
mechanical. Cost share is for establishment of grass on spoil and
disturbed areas.
Ponds 378 – 3111 cubic yards maximum. Average cost = $1.50 per cubic
yard.
Critical Area Planting 342 – Average cost = Seedbed Prep – Medium at $38
per acre, Seeding operation – Broadcast and Roll at $10 per acre, Seed –
Common Bermuda at $3 per pound PLS. This is for establishment of grass
on spoil and disturbed areas of pond.
Nutrient Management 590 – Average cost = $48 per acre. Cost share is for
establishment of grass on spoil and disturbed areas of pond.
Pest Management 595 – Average cost = $15 per acre, chemical or
mechanical. Cost share is for establishment of grass on spoil and
disturbed areas of pond.
Fence 382 – 2640 feet maximum. Average cost = $2.00 per foot, 4 wire
standard. Permanent electric fence - 4 wire, $1.00 per foot, energizer
$225.
Grade Stabilization Structure 410 – Average cost = $1.50 per cubic yard,
7000 cubic yard maximum, 14 gauge pipe-1400 diameter feet or 12 gauge
pipe-1530 diameter feet. $3000 maximum cost share on pipe. Rock Panel
Drop – 75 tons of rock or $4000 maximum cost share.
Critical Area Planting 342 – Average cost = Seedbed Prep – Medium at $38
per acre, Seeding operation – Broadcast and Roll at $10 per acre, Seed –
Common Bermuda at $3 per pound PLS. This is for establishment of grass
on spoil and disturbed areas of GSS.
Nutrient Management 590 – Average cost = $48 per acre. Cost share is for
establishment of grass on spoil and disturbed areas of GSS.
Pest Management 595 – Average cost = $15 per acre, chemical or
mechanical. Cost share is for establishment of grass on spoil and
disturbed areas of GSS.
Grassed Waterways, Terraces, and Grade Stabilization Structures -
For cost share consideration, these practices must be needed to
significantly reduce soil erosion on cropland-
Grassed Waterways 412 – 5 acres maximum, Average cost = $450 per acre
for light shaping and spoil spreading, $550 per acre for medium shaping,
$700 per acre for heavy shaping.
Critical Area Planting 342 – Average cost = Seedbed Prep – Medium at $38
per acre, Seeding operation – Broadcast and Roll at $10 per acre, Seed –
Common Bermuda at $3 per pound PLS. This is for establishment of grass
on Grassed Waterways.
Nutrient Management 590 – Average cost = $48 per acre. Cost share is for
establishment of grass on Grassed Waterways.
Pest Management 595 – Average cost = $15 per acre, chemical or
mechanical. Cost share is for establishment of grass on Grassed
Waterways.
Terraces 600 – Average cost = $.70 per foot. A maximum of 10,000 linear
feet will be cost shared.
Grade Stabilization Structure 410 – Average cost = $1.50 per cubic yard,
7000 cubic yard maximum, 14 gauge pipe-1400 diameter feet or 12 gauge
pipe-1530 diameter feet. $3000 maximum cost share on pipe. Rock Panel
Drop – 75 tons of rock or $4000 maximum cost share.
Critical Area Planting 342 – Average cost = Seedbed Prep – Medium at $38
per acre, Seeding operation – Broadcast and Roll at $10 per acre, Seed –
Common Bermuda at $3 per pound PLS. This is for establishment of grass
on spoil and disturbed areas of GSS.
Nutrient Management 590 – Average cost = $48 per acre. Cost share is for
establishment of grass on spoil and disturbed areas of GSS.
Pest Management 595 – Average cost = $15 per acre, chemical or
mechanical. Cost share is for establishment of grass on spoil and
disturbed areas of GSS.
Ranking Criteria:
Plant Health – Resource Concern on Pastureland – 50 Points Maximum
- Pasture Planting – 100 acres maximum – 35 points
- Critical Area Planting – 5 acres maximum – 35 points
- Pond – 3111 cubic yards maximum – 15 points
- Fence – 2640 feet maximum – 15 points
- Grade Stabilization Structure – 10 points
Soil Erosion – Resource Concern on Cropland – 50 Points Maximum
- Grassed Waterways – 5 acres maximum – 25 points
- Terraces – 10,000 linear feet maximum – 25 points
- Grade Stabilization Structure – 25 points
Additional points for both Plant Health and Soil Erosion Resource Concerns
Practice distance from Named Water Body on USGS Topo Map-
- 0-200 feet - 10 points
- 201-400 feet - 9 points
- 401-600 feet - 8 points
- 601-800 feet - 7 points
- 801-1000 feet - 6 points
- 1001-1200 feet - 5 points
- 1201-1400 feet - 4 points
- 1401-1600 feet - 3 points
- 1601-1800 feet - 2 points
- 1801-2000 feet - 1 point
- >2000 feet - 0 points
< Back to EQIP
| |
|